✅ FACT:
🔹 CBM reports are accepted by classification societies – DNV, ABS, BV, LR.
🔹 Thanks to this, the shipowner can obtain credits and reduce the need to dismantle functioning equipment during surveys.
🔹 CBM can shorten dry dock time by as much as 2–5 days.
The impact in numbers:
1 avoided day of downtime = approx. USD 100,000 in savings
3 fewer days in dry dock = USD 300,000 saved for the shipowner
This is not theory – it’s a hard result, proven in practice.
If your fleet could shorten a survey by 3 days, what would you do with the USD 300,000 saved?